Eni announces the recent start of production from two gas fields related to the Berkine Sud contract in Algeria, just 6 months after the contract was awarded through an accelerated development (fast track). The production of the Berkine South, which is the first contract to be signed under the new Algerian hydrocarbon law 19-13, is operated by Eni and Sonatrach, and currently has a production capacity of 1 million standard cubic meters per day of gas (MSm3/d) and approximately 4,000 barrels per day of associated liquids. This capacity is expected to increase to around 2 MSm3 / d by the end of the year, reaching the full potential of the MLE gas treatment plant, equal to 11 MSm3/d.