The National Petroleum Construction Co. and Technip have jointly won a USD 370 million engineering, procurement and construction (EPC) contract from Abu Dhabi Marine Operating Co. to expand gas processing facilities at Lower and Upper Zakum Fields in Abu Dhabi. The project aims to increase processing capabilities of associated gas at the fields to up to 440MMSCFD in order to cope with future oil production increases.