Aker Solutions has signed a USD 37 million contract with Petrobras to supply eight subsea boosting systems (Mobo) and one ESDV (emergency valve) for the Jubarte field, located in the north of Campos Basin offshore Brazil. Compared to the previous project, improvements have been made in the project scope to optimise oil production, such as changes in flow lines to reduce pressure loss. Additionally, pressure in the pump has increased from 3600 to 5000PSI. There will also be changes on valves, pipes and structures, besides the inclusion of nine new tools to support the installation. The equipment will be manufactured in Curitiba, Aker Solutions’ headquarters in Brazil. Contract party in Aker Solutions do Brasil ltda.