
The contract covers the design, engineering, fabrication and subsea installation of more than 28mi of flowlines, steel catenary risers, pipeline end terminations, piles and structures. Technip’s operating center in Houston, Texas will perform the overall project management.
The flowlines and risers will be welded at the Group’s spoolbase in Mobile, Alabama. Offshore installation is scheduled to be completed with the Deep Blue, one of Technip’s deepwater pipelay vessel, during the first half of 2013.