PETRONAS FLNG1 subsea tie-back contract for Technip

Technip has been awarded an engineering, procurement, construction, installation and commissioning contract by PETRONAS Carigali for the tie-in of PETRONAS first Floating Liquefied Natural Gas (PFLNG1) facility to KAKG-A platform in Kanowit field, located 200km offshore Bintulu, East Malaysia, at a water depth of approximately 80m.

The contract covers the procurement and installation of a 3.2km flexible flowline between the existing KAKG-A central processing platform in Kanowit field to the PFLNG1 riser. It also includes modification and tie-in works at KAKG-A. Technip’s operating centre in Kuala Lumpur, Malaysia, will execute the contract. The flexible flowline will be manufactured in Asiaflex Products, Technip’s manufacturing facility in Tanjung Langsat, Johor, Malaysia. It will then be installed by the Group’s multipurpose vessel, the Deep Orient. The installation campaign is scheduled for completion in late 2015. KK Lim, president of Technip in Asia Pacific, commented, “With this award, we are able to offer to PETRONAS a competitive solution through our unique vertically integrated value chain for subsea infrastructures, from the design and manufacture of the flexible pipes up to its installation, using Technip assets”.

The PFLNG1 vessel, which will produce 1.2Mt of LNG per year, will play a significant role in PETRONAS’ efforts to unlock gas reserves in Malaysia’s remote and stranded fields to help meet the growing demand for gas.

Previous articleGE ships LNG compressor trains for Cove Point
Next articleShowcasing SIPOS SEVEN