Wood Group has won two separate contracts related to BP’s Mad Dog 2 project providing engineering services to further develop deepwater production.
Wood Group has been contracted by Samsung Heavy Industries to provide detailed engineering and procurement services for BP’s Mad Dog Phase 2 floating production unit. The USD 80 M contract follows the December 2016 completion of Interim Agreement Period (IAP) early work, which was valued at USD 4.5 M.
In addition, as a part of the recently signed global services agreement with BP, Wood Group’s Specialist Technical Solutions (STS) business was awarded a USD 4.89 M contract for Subsea Engineering and Project Management Services to the Mad Dog 2 project. That work includes gas lift system interface design, geospatial information system support, subsea controls engineering, and geotechnical engineering support.
Mad Dog 2 is the second platform designed by Wood Group for BP in the Gulf of Mexico Mad Dog field.