AVK supports a Water Corporation project

Water Corporation is in the practical completion stage on a major upgrade for the rural town of Collie in the south west of Western Australia. An 8 kilometre pipeline has been under development from the southern end of Stirling Dam connecting to an existing pipeline to the north west of Harris Dam. The project was implemented to improve on the town’s quality of drinking water and maintain an efficient supply of the resource within the dry months when rainfall is at its minimum. AVK Flow Control supplied 6x Wouter Witzel butterfly valves ranging from a minimum of DN700 to a maximum of DN900.

The valves were manufactured to Australian standards and designed to provide a resourceful flow and transfer of water, thus ensuring the sustainability of Harris Dam. The specifications of the installation required customised electronic actuators that could be monitored and controlled from remote locations around Australia when water levels begin to reach critical points.

Previous articlePneumatic vane actuators for food processing
Next articleUnion Tech in ExxonMobil AML