Qualified oil production for the 180 Project

Wison Engineering Services Co. Ltd. (Wison Engineering), has announced that Wison Engineering Ltd., an indirect non-wholly owned subsidiary of the Group, has successfully completed the overall process flow of 1.8 Mpta high-sulfur coal liquefaction and heating and power integration demonstration project (180 Project). This is an EPC project by Wison Engineering for Lu’an Group.

With the production of the first barrel of qualified blended diesel oil, the facility has successfully entered into a stable production stage with enhanced efficiency. It also marks the establishment of the world’s largest independent gasifier and purification plant, achieved through a technological breakthrough in using high-ash melting points and low silica-alumina coal in a large-scale, pulverized coal gasifier. By using waste high-sulfur coal to produce clean oil and highly-refined chemical products, the 180 Project sets an example for the use of high sulfur coal in green, energy conservation and emission-reduction projects.

Instead of petroleum-based products, the 180 Project adheres to a differentiated, high-end, scaled and international coal-based chemical industry development strategy.

Previous article±800kV UHVDC converter valves are energized
Next articleCGIS, DSS Valves enter into partnership