TurkStream gas pipeline officially launched

A grand opening ceremony for the TurkStream gas pipeline took place recently. Attending the event were Vladimir Putin, President of the Russian Federation, Recep Tayyip Erdogan, President of the Republic of Turkey, Aleksandar Vucic, President of the Republic of Serbia, Boyko Borissov, Prime Minister of the Republic of Bulgaria, Alexander Novak, Minister of Energy of the Russian Federation, Fatih Donmez, Minister of Energy and Natural Resources of Turkey, and Alexey Miller, Chairman of the Gazprom Management Committee. Burhan Ozcan, Chairman of the Board and General Manager at BOTAS, and Oleg Aksyutin, Deputy Chairman of the Management Committee Head of Department at Gazprom, joined the event via teleconference. 
TurkStream, which is laid in the Black Sea, is a link between the gas transmission systems of Russia and Turkey. The gas pipeline has two strings with a combined throughput capacity of 31.5 billion cubic meters. The first string will deliver gas to Turkey, while the second string is intended for gas transit to southern and southeastern Europe through Turkish territory.
The pipelaying for TurkStream took 15 months and was completed ahead of schedule in November 2018. The construction of the receiving terminal near the Kiyikoy settlement in Turkey was finished in 2019.
The starting point for feeding gas into TurkStream is the Russkaya compressor station (CS), which forms part of Russia’s Unified Gas Supply System and is located near Anapa. With a capacity of 224 MW, the CS maintains the pressure required for transmitting gas along the pipeline’s two strings through more than 930 km up to the Turkish coast where gas enters the receiving terminal.
Previous articleFeatured Story – Regulating hot air with valves
Next articleInserta Introduces Ic Optimizer In-line Control Valves