Azule Energy, via its wholly owned subsidiary Eni Angola, together with its Partners in Block 15/06, Sonangol P&P and SSI Fifteen Limited, are pleased to announce the award of the main contracts for the development of the Agogo Integrated West Hub Development Project, one of the major upstream projects being developed in the coming years in Angola.
The contracts, for an overall value of around USD 7.8bn, were awarded to Yinson for the Supply of the FPSO and Field Operations and Maintenance services; Baker Hughes for the supply of Subsea Production System and Aftermarket Services; Aker Solutions for the Supply of Umbilical System; Saipem for the Supply Rigid Flowlines and Subsea Structure Transportation and Installation; Subsea 7 for Risers, Flowlines and Subsea structures transportation and installation; and TechnipFMC for the Supply of Risers and Flowlines.
The project comprises 36 new wells (21 producers and 15 Injectors), one converted FPSO with a capacity for 120.000 bbl/day of oil production, 230MMSCF/day of Gas Injection, and 120.000 bbl/day of water injection. It will also entail approximately 100km of rigid flowlines, 100km of flexible flowlines, and 100km of Umbilicals.
The Agogo Integrated West Hub will produce hydrocarbons from Agogo and Ndungu Fields via both the existing Ngoma FPSO and the new Agogo FPSO that will be operational from mid f 2026, reaching a peak of production of 175.000 Bbl/day, thus fully exploiting the utilization and synergies with the existing infrastructures of the western area of the block 15/06, to optimize the project schedule and associated cost.