BHP awards McDermott marine installation contract

McDermott International, Ltd has been selected by BHP to provide a marine installation campaign for the Shenzi Subsea Multiphase Pumping Project (SSMPP). The project is located approximately 138 miles (222 km) offshore in the Gulf of Mexico at a water depth of 4,400 feet. 
The scope of the contract includes project management; detailed design and fabrication for a pump station suction pile; umbilical installation and flexible jumpers and flying leads installation; transport of all materials and equipment; and pre-commissioning services and other necessary testing and surveys.
Engineering, procurement, and project management services will be led by McDermott’s Houston engineering group. McDermott’s North Ocean 102 vessel—which has a proven track record of safely executing similar projects—will be used for the transport and installation of the material and equipment.
The project will commence immediately and is expected to be completed in the summer of 2022.
McDermott is currently providing Front-End Engineering Design (FEED) of a Semi-submersible Floating Production Unit (FPU) for the Trion Project in the Gulf of Mexico, another BHP project, in partnership with Pemex. McDermott was previously awarded and completed services under an initial pre-FEED contract for the Trion FPU.
Previous articleNeles enhances the production of valves in Vantaa
Next articleFeatured Story – Golden future ahead for valve traders!