Celeros FT signs CPA with Aramco

Celeros FT is proud to announce that the company signed a Corporate Procurement Agreement (CPA) with Aramco, marking a key milestone in the strategic partnership, which began in the 1950s, and reinforcing a shared commitment to localization, industrial development, and long-term value creation, in alignment with Saudi Vision 2030.

The CPA establishes a long-term framework to support Aramco’s existing operations and future projects, with a strong focus on the local manufacturing of key pumps and midstream pipeline solutions that are essential for a safe, reliable, and efficient energy infrastructure across the Kingdom.

A central element of the agreement is the expansion of local manufacturing capabilities for key pumps from our ClydeUnion Pumps, Plenty, and S&N Pumps brands and midstream flow solutions from our M&J Valve, Copes Vulcan, and GD Engineering brands, which will support Aramco’s pipeline networks, terminals, and processing facilities. These solutions play an important role in ensuring operational continuity, asset integrity, and efficiency across upstream, midstream, and downstream operations.

By strengthening in-Kingdom manufacturing, assembly, testing, and aftermarket support, the partnership aims to enhance supply chain resilience, reduce lead times, and support Aramco’s long-term operational requirements for pipeline and fluid handling systems.

Aligned with Vision 2030’s goal to build a diversified, knowledge-based economy, the CPA emphasizes technology transfer, capability development, and workforce localization. Celeros FT seeks to invest in the professional development of Saudi engineers, technicians, and specialists through structured training and hands-on manufacturing and service programs, enabling the transfer of global expertise into the Kingdom.

Previous articleFCM acquires Kingston
Next articleAMPO drives Samarco Germano mine operational renewal plan