Orseal valves chosen for Filanovskogo field

Orseal won a prestigious contract to supply a range of valves from ½” to 20”, manual and pneumatic, actuated and motor operated for the Filanovskogo (Filanovsky) field, 50k offshore in the Northern Caspian Sea. The infrastructure at the Vladimir Filanovsky offshore field consists of a 15,200t ice-resistant fixed platform (IRFP-1); a living quarters module platform; a 21,000t central processing platform (CPP) to process and pipe the oil and gas ashore, and a risers block (RB) platform, all linked with connection bridges. Construction works include the laying of 330km of subsea pipeline and 350km of onshore pipeline.

Orseal supplied valves in carbon steel to suit the specific temperature requirements of -30 degrees C. All valves needed to conform to the Russian GOST certification standard – with Orseal supplying all documentation and related drawings to ensure compliance. They were on-site with the supplier for full inspection of all valves to avoid any discrepancies and non-conformance, and to save the client’s time. Orseal engineers assisted with logistics and delivery at the client’s site to reduce any delays, including packing for export to suit air freight and delivery to the overseas client fabricator.

Previous articleTAP awards EPC contracts for pipeline sections
Next articleNew ASCO.COM unites ASCO and Numatics products