Pegaga development project in Malaysia

Ending the week with the completion of the Actuators for Pegaga Development Project. After a successful Inspection in the plant, these Spring Return Actuators (Models PNS-8-314-SRC4F-ITR; PNS-1-122-SRC4B-ITR; PNS-31M-1590-SRC4H-ITR; PND-8-615-SRO6F-ITR) will be shipped to Sarawak, in Malaysia. Their Control Systems include a Solenoid Valve and a Microswitch Box. There is an Air Tank for Emergency operation.

Previous articleENGIE & Equinor launches the H2BE project
Next articleCeleros Flow Technology’s new offers