Santos awards FEED contracts for Barossa project

Santos has announced progress on the front end engineering and design (FEED) phase of the Barossa offshore project with the award of three major engineering contracts.

The Barossa development concept includes a floating production storage and offloading facility (FPSO), six subsea production wells to be drilled in the initial phase, subsea production system, supporting in-field subsea infrastructure and a gas pipeline to Darwin, all located in Australian Commonwealth waters.

Separate engineering contracts for the FPSO have been awarded to MODEC and a consortium between TechnipFMC and Samsung Heavy Industries. A design competition will be conducted between the two groups.

A third contract, for the subsea infrastructure including umbilicals, flowlines, risers and gas export pipeline, has been awarded to INTECSEA.

The Barossa gas field, 300 kilometres north of Darwin, sits within Santos’ Northern Australia portfolio, one of the company’s core long-life, natural gas assets.

Previous articleRingo Válvulas supplies valves to Almaraz NPP
Next articleOil & gas: The rise of IIoT