Setpoint I.S. wins valve contract for Cameron LNG

Setpoint Integrated Solutions (Setpoint I.S.), an industrial supplier of engineered process control solutions announced that it has been selected to supply all control, safety relief and automated isolation valves for Cameron LNG, a large liquefied natural gas terminal located in the state of Louisiana.

Setpoint I.S. will execute its workflow process that optimises each project’s timeline and cost by being engaged in selecting, sourcing and providing the majority of the automated on-off valves, control valves and safety relief valves. “We’ve created an efficient and transparent workflow process to provide turnkey solutions stemming from our manufacturer relationships and robust application engineering integrated with life cycle cost considerations to provide the best result for all the parties involved”, said Joey Jobe, chairperson of Setpoint I.S.

Setpoint I.S.’ application experts, the OEM manufacturers and the engineering contractor will work side-by-side to engineer, size, specify, assemble and provide thorough documentation packages for execution. “We focus our efforts on providing not just integrated process solutions, but long-term partnerships with our clients”, said David Ross, vice president of supply chain and director of this project. “Setpoint’s EPC Workflow Process offers added value in optimising cost savings and minimising risks for both the end user and EPC”, added Ross.

Previous articleMixproof valves for no cross-contamination
Next articleNORSOK-certified plastic stock shapes from Quadrant