Technip has been awarded by TAP a Project Management Consultancy (PMC) Services contract, for a project designed to transport gas from the Shah Deniz field to the European market.
TAP project scope includes an approximately 870km long pipeline, which will start from the tie-in with the TANAP portion of the Southern Gas Corridor project, at the Greece/Turkey border. The pipeline will then go through Greece and Albania, to eventually cross subsea the Adriatic Sea to end in Puglia, Italy, where it will connect to the Italian natural gas network. TAP will open a new route for natural gas from the Caspian Sea region. It is designed to transport 10BCM/y with a potential future expansion to 20BCM/y.
The PMC contract awarded to Technip will cover the onshore portion of the pipeline from Greece to Albania and in Italy. The services will include the overall project and site management, procurement and subcontracting for all the EPC packages throughout the engineering, procurement and construction phases, as well as warranty management and the project close-out. The project completion is scheduled for the first quarter of 2020.
The services will be mainly performed at TAP’s headquarters in Baar, Switzerland, and Technip’s office in Rome, Italy. Other project centres will be operating in Greece, Albania and Italy.