TechnipFMC (FTI) has been awarded a contract by Woodside to upgrade the Pluto Platform Offshore for water treatment, located offshore Western Australia.
The contract includes the engineering, procurement, construction, installation and commissioning (EPCIC) of the Pluto Water Handling Module. This module, to be installed on the existing Pluto Alpha Gas Production Platform, will consist of facilities for water separation and treatment, together with upgraded power generation units.
The Pluto offshore facility is located approximately 190 kilometers off Karratha, in Western Australia’s north-west. The produced gas from the offshore facility is transferred through an existing pipeline to Woodside’s Pluto LNG Onshore plant.