Wärtsilä has been awarded a turn-key contract with Hamina LNG Oy to supply a liquefied natural gas (LNG) receiving terminal to be built in Hamina, Finland.
The scope includes site filling, soil refurbishment, civil works, infrastructure, full containment storage tank with a combined net volume of 30 000 m3, regasification and gas metering, BOG (boil-off gas handling) system, electrical and control system, unloading, loading system and bunkering and truck loading. The LNG terminal is scheduled to be operational in August 2020.
The port of Hamina will be the first LNG receiving terminal in Finland connected to Finnish gas grid, offering security of supply to gas customers.