Weir Oil & Gas launches offline cementing solution

Weir Oil & Gas, an upstream provider of systematized pressure pumping and pressure control equipment and services, announced the launch of its new Offline Cementing Solution. The Offline Cementing Solution generates substantial reductions of non-productive time (NPT) and operating costs. 
As multi-well pad drilling becomes increasingly common across North American basins, E&P companies seek to improve the overall economics of their drilling operations. NPT is common in multi-pad drilling as crews wait on one another to complete each operation. Weir’s Offline Cementing Solution gives operators back valuable drilling time as it removes cementing from the critical path.
Weir’s Offline Cementing Solution incorporates Weir’s Quick Connect (WQC) for a tool-free set up in eight minutes. BOP configuration adjustments are unnecessary, and testing isolation in the backside of the well is possible for greater security and well integrity. Field crews can be managed with pinpoint accuracy to reduce costs. Operators using Weir’s Offline Cementing Solution in the field have saved as much as 11 hours of NPT and $38,000 per well.
Weir’s Offline Cementing Solution is supported by Weir Edge™ Services, Weir’s global service offering from expertly trained engineers and field technicians. With service and training centers in every U.S. basin and every part of the globe, Weir Edge™ Services supports operators with global access to local engineering experts, highly skilled field support, and 24/7 maintenance.
Previous articleNew mechanical face seals catalog released
Next articleFeatured Story – Top 10 causes of valve failure