All-new low pressure regulator on two week deliver

Metso to modernize Salmisaari power plants
The new automation is set to replace the existing automation system installed in Plant B in 1984 to produce electricity and district heat, as well as the system installed in Plant A in 1986 to produce district heat.
Petrobras’ long-term technological strategy

Rotork selected for control duties
Compressor stations along the route are designed to preserve the pressure level in the networks and transfer the gas for local area consumption.
Val-Matic’s American-BFV butterfly valve
